Banner

Energized Downed Conductor - High-Impedance Fault

0 + Years

In Electric Utility Service

0 +

Employees

0 Mn +

Customers

Business Strategy Image

Business Need

  • Directed by PUC (Public Utilities Commission) to develop technologies to reduce the probability of public fatalities
  • Cost of incident
  • Public reputation

Challenge

  • New technology using AMI data
  • Competing for resources allocated to other methods
  • Limited number of verified EDC cases
  • Pilot required upload of new configuration to all meters
  • Very large data set to analyze
  • Analytics needed to address multiple classes of EDCs, including: load site, source side, and compound incidents
  • Pilot integration with the Utility’s systems to include electrical connectivity mode
Business Strategy Image
Business Strategy Image

Solution and
Results

  • Tools developed to analyze data
  • New meter configuration uploaded to all meters to enable meters to provide realtime data
  • Identified new analytics to include pattern analytics and increase confidence
  • Methods developed to reduce false positives
  • Regression showed analytics identified a high percentage of EDCs, as well as the precise location and an accurate confidence level